贵州快3 The project required the integration of a new 11kV gas turbine generator into the existing 11/415V infrastructure. The exiting power plant had 4 x 415V generators, the new 11kV gas turbine generator replaced the existing 415V generators. PSD Energy provided the protection and control panels supplied within the portable control room fully factory tested including the on site commissioning.

The project involved:

1 x 9MW 11kV Gas Turbine generator;

13 x 11kV Switchboard (feed to the 11kV plant distribution);

5 x 11kV/415V Transformers;

 